Johan Cruyff Stadium

Architect
Batlle I Roig
Promoter
FC Barcelona
Builder
Comsa
Status
Sant Joan Despí – Barcelona
Cost
12,000,000 €
Surface area
7245 m2
Year of the project
2015-2016
Year of the building works
2017-2019

Description

The project aims to locate the new Ministadium facilities within the Joan Gamper Sports Complex in Sant Joan Despi.

Facilities which need to held more than 6000 spectators, which is technologically innovative, with a high level equipment and, above all, which reflect the values of the club. The second FCB football team will start the 2017-18 season at the Miniestadi: is scheduled to start the construction at January 2016 and the inauguration of Miniestadi will coincide with the start of the season. Design made with BIM methodology.
Design made with BIM methodology.