Skip to main content

Details

Restoration of the Mare de Déu de la Mercè Hospital

Architect
VITALLER
Promoter
HER. HOSPITALARIAS
Builder
CEVSA
Status
Cost
-
Surface area
1500 m2
Year of the project
2022
Year of the building works
En construcción-

Description

The renovation of the Hospital de la Mare de Déu de la Mercè is being carried out on different floors to adapt a building dating from the 1950s to the needs of a modern treatment programme. At bis we have collaborated in the renovation project of the ground floor and the third floor.

The renovation of the third floor converts an area of rooms into offices for administration and consultations, while on the ground floor new rooms are created for patient care and a new entrance.

The constraints of the existing structure and the architectural desire to have the maximum height led us to look for imaginative alternatives for the circulation of electrical conduits, pipes and ducts on each floor, leading to unusual schemes in which the installations circulate through false ceilings inside the offices and not through corridors, where the beams did not allow this.

The renovation of the installations is complete, allowing the spaces to be equipped with individual air-conditioning, high quality LED lighting, and electrical and telecommunications equipment for work points.

Bis Copyright ⓒ 2023 | All rights reserved | Data protection

Bis Copyright ⓒ 2023 | All rights reserved